Low Danube Water Levels Force Shutdown of Romania's Cernavoda Nuclear Plant
Romania's Cernavoda nuclear plant temporarily shut down over low Danube levels, with authorities planning to cover the power shortage through imports.
Romania's Cernavoda nuclear power plant has temporarily halted operations due to low water levels in the Danube River, according to Romanian Energy Ministry State Secretary Sorin Elisei. The shutdown began on Thursday, following the first reactor's shutdown last week. Authorities are planning to cover the electricity supply shortage through imports, primarily from Bulgaria, while monitoring weather forecasts that could impact supply estimates.
The plant will remain out of service for at least 10 days, with full operation expected to resume in one to two days once water levels improve. The Cernavoda plant, Romania's sole nuclear power facility, generates around 20% of the country's electricity. The shutdown was declared on July 31 due to declining electricity production amid a drought, prompting the government to raise the energy sector's alert level.
Written by urgent.news from Tempo.co English's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Romania shuts only nuclear plant as heat causes huge drop in Danube River level kahawatungu.com
- Nero’s Bridge emerges from Tiber River as Rome faces water crisis apnews.com
- Romania shuts nuclear plant, Hungary dams dry Danube River dw.com
- Romania shuts down nuclear plant due to low level of drought-hit Danube rfi.fr
- Romania begins shutdown of nuclear plant's 2nd reactor amid low water levels on Danube River pbs.org
- Romania Shuts Nuclear Reactor on Danube as Power Crisis Deepens balkaninsight.com
- Romania shuts nuclear plant as Danube drops channelnewsasia.com
- Romania shuts only nuclear plant as heat causes huge drop in Danube River level bbc.co.uk