FG Announces Two Weeks Closure of First Niger Bridge for Repairs
David-Chyddy Eleke in Awka The Federal Ministry of Works, Anambra State Field Headquarters has officially announced the closure of the First Niger Bridge in Onitsha for the commencement of repair
The Federal Ministry of Works has announced a two-week closure of the First Niger Bridge in Onitsha, Anambra State, for urgent repair works. The closure, effective from Monday, 7th September 2026, follows a visit by Minister of Works, Engr Dave Umahi, who expressed concern over the bridge's deteriorated condition due to vandalism.
Scavengers had stolen bolts and iron rods from a vandalized section of the bridge. The Federal Ministry of Works has directed the contractor, Messrs SKECC, to commence emergency maintenance works immediately. The repairs will include milling/removal of the existing deteriorated asphalt surfacing, laying of an asphalt wearing course, and installation of solar-powered streetlights and CCTV cameras.
The bridge will be fully closed to traffic from Monday, 7th September 2026, with the maintenance expected to be completed by Monday, 21st September 2026. Motorists are advised to use the Second Niger Bridge route and follow all traffic diversion instructions to ensure safety during the closure period.
Written by urgent.news from This Day's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.