Rescuers dig into tunnel as missing toll from Nepal and China flood nears 3,000
In a breakthrough late Saturday, the Nepali army was able to insert a pipe into a tunnel at the Trishuli 3A hydroelectric site where workers are believed to be trapped.
Rescuers have made progress in a tunnel at the Trishuli 3A hydroelectric site in Nepal, where workers are believed to be trapped. According to the Japan Times and Le Monde English, the Nepali army inserted a pipe into the tunnel late on Saturday. The tunnel is thought to contain over 100 workers who may still be alive.
The death toll from the floods at the Nepal-Tibet border has risen to at least 682, according to Le Monde English. The US Geological Survey attributed the deadly torrent to a glacial collapse.
The floods have also affected Australians, with 42 reported missing, The Age reports. Families and friends of the missing Australians are waiting anxiously for news as rescue efforts continue.
Brief written by urgent.news from Japan Times, The Guardian, The Guardian Australia, Le Monde English, The Age — 5 reports on this story. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Missing toll from Nepal, China floods nears 3,000 freemalaysiatoday.com
- Rescuers dig into tunnel as missing toll from Nepal, China disaster nears 3,000 channelnewsasia.com
- Number of missing in Nepal and Tibet rises to nearly 3,000 peopledaily.digital
- Nepal floods leave 55 Malaysians uncontactable, 36 more missing in China, says ministry malaymail.com
- Rescuers dig into tunnel with hopes to rescue dozens as missing toll from Nepal, China flood nears 3,000 lemonde.fr
- Nepal's foreign minister calls for global climate change crackdown as flooding death toll rises cbsnews.com
- Days after deadly Nepal flood, families of missing B.C. couples desperate for details cbc.ca
- 573 workers trapped or missing at 11 Nepal hydropower sites after flash floods hindustantimes.com