Hydropower capacity hit after floods, Nepal seeks advance power imports from India
Nepal's hydropower generation has plummeted by approximately 550 megawatts (MW) due to flash floods, prompting the government to seek advance approval for electricity imports from India, according to Indian government officials. This reduction in production comes as Nepal's power plants, including several hydropower stations and a solar plant, were damaged by the catastrophic weather event.
The affected installations, which are spread across Rasuwa and Nuwakot districts, include plants with a combined capacity of 236 MW already operational and another 342.42 MW under construction. Notably, the 14-MW Devighat hydropower plant, a crucial supplier of electricity to India, was also impacted by the floods. Despite this substantial drop in capacity, Indian authorities maintain that Nepal's domestic power generation shortfall is temporary and does not necessitate any extraordinary emergency measures or alter the country's internal energy supply.
Written by urgent.news from The Indian Express - India's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Sadhguru's Isha Foundation shares update on 77 pilgrims missing after Nepal floods hindustantimes.com
- Nepal floods: 3 days roll on with no trace of 77 Isha Foundation missing pilgrims | ‘Rescue teams are on ground but….' livemint.com
- UN, Nepal warn of climate threat after deadly floods channelnewsasia.com
- Nepal Flash Flood Live Updates: At least 682 killed, nearly 3,000 missing in deadly Nepal floods indianexpress.com