Hydropower capacity hit after floods, Nepal seeks advance power imports from India
Nepal's hydropower generation has plummeted by approximately 550 megawatts (MW) due to flash floods, prompting the government to seek advance approval for electricity imports from India, according to Indian government officials. This reduction in production comes as Nepal's power plants, including several hydropower stations and a solar plant, were damaged by the catastrophic weather event.
The affected installations, which are spread across Rasuwa and Nuwakot districts, include plants with a combined capacity of 236 MW already operational and another 342.42 MW under construction. Notably, the 14-MW Devighat hydropower plant, a crucial supplier of electricity to India, was also impacted by the floods. Despite this substantial drop in capacity, Indian authorities maintain that Nepal's domestic power generation shortfall is temporary and does not necessitate any extraordinary emergency measures or alter the country's internal energy supply.
Written by urgent.news from The Indian Express - India's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Govt to deploy SMART rescue team to flood-hit Nepal along with US$1m in aid thevibes.com
- Nepal floods: 3 days roll on with no trace of 77 Isha Foundation missing pilgrims | ‘Rescue teams are on ground but….' livemint.com
- India sends 4th relief flight to flood-hit Nepal; 108 Indian nationals rescued, 275 still missing hindustantimes.com
- Foreign minister says briefing today for families of Malaysians missing in Nepal floods malaymail.com
- Nepal Flash Flood Live Updates: At least 682 killed, nearly 3,000 missing in deadly Nepal floods indianexpress.com
- UN, Nepal warn of climate threat after deadly floods channelnewsasia.com