West River secures feed-in approval for two Perak hydropower projects
KUALA LUMPUR: West River Bhd’s subsidiary Neutron Power Sdn Bhd has secured feed-in approval from the Sustainable Energy Development Authority Malaysia for two small hydropower projects in Perak under the 2026 feed-in tariff (FiT) system.
KUALA LUMPUR: West River's subsidiary, Neutron Power Sdn Bhd, has received feed-in approval from Malaysia's Sustainable Energy Development Authority for two small hydropower projects in Perak under the 2026 FiT system. The projects are situated in Hutan Rizab Bukit Kinta and Hutan Rizab Bukit Tapah in Ulu Kinta and Bidor, respectively.
The approval covers both the total installed capacity and net export capacity, with an applicable FiT rate, and the commencement date is set for August 17, 2031. This approval represents another step in West River's expansion into renewable energy, as the group aims to diversify its earnings through hydropower projects. The company sees hydropower as a long-term growth area due to its reliability and potential contribution to Malaysia's transition towards a lower-carbon energy mix.
West River plans to proceed with the projects following regulatory requirements and development timelines, while also pursuing other renewable energy opportunities.
Written by urgent.news from New Straits Times's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.