When a deadline becomes a ghost: building Deadline Graveyard with Kiro
I wrote this as part of the Kiroween 2026 hackathon , where Deadline Graveyard is my Costume Contest entry. A candle can tell a different story from a red overdue badge. It gets shorter while there is still time to act. A ghost asks whether a project has been neglected. A lantern lets completed work remain visible. Deadline Graveyard uses those forms as controls in a deadline tracker for students…
In the Kiroween 2026 hackathon, the Deadline Graveyard project was created as part of the costume contest. The idea behind this project is to visually represent deadlines and their status using candle, ghost and lantern metaphors. A candle symbolizes a countdown, a ghost indicates a neglected project, and a lantern highlights completed work. This deadline tracker for students and builders uses these metaphors as controls.
Kiro's Command Line Interface (CLI) helped transform the concept into feature specifications, EARS requirements, design documents and traceable tasks. The project specifies a UTC deadline, which does not depend on the user's selected timezone. A missed deadline is determined by a specific instant in time and only appears if the item is unresolved and not yet overdue. Once a deadline is submitted and marked as "buried," it cannot be changed.
The project follows a strict file structure with five separate steering files that define the product direction, stack decisions, folder structure, domain invariants, and visual system. This separation keeps timezone rules, typography, contrast, motion rules, and interface design tightly coupled. Tests were conducted to ensure the metaphor's boundaries are respected, such as the candle's last 24 hours equating to 24 elapsed hours.
Another crucial aspect of the project is accessibility. The scene and text list share a single derived state to ensure that an appealing illustration is also usable for keyboard navigation. The saved record is designed to work with an online app, not as an offline application. End-to-end tests uncovered a practical gap when offline testing was attempted, highlighting the importance of testing the entire user journey rather than isolated components.
Kiro CLI played a significant role in the development of Deadline Graveyard, helping create the plan, specifications, steering files, and feature implementation. The repository contains various scripts for testing, commit checks, build audits, and documentation synchronization. However, some aspects, such as Kiro IDE property extraction, have not yet been implemented.
While the build has passed numerous tests, including unit, property, and browser tests, the project remains a design hypothesis that needs to be validated with student users.
Rewritten by urgent.news; may contain errors — check the original.
Source: dev.to