Key consultancy contract for North-South high-speed railway project signed
The Thang Long Project Management Unit held a signing ceremony on November 25 for Contract Package TV-02, covering consultancy services for surveys and the preparation of a feasibility study report for the North-South high-speed railway project.
On November 25, the Thang Long Project Management Unit signed a contract to provide consultancy services for surveys and the preparation of a feasibility study report for Vietnam's North-South high-speed railway project. The contract, known as Contract Package TV-02, includes front-end engineering design (FEED) and bidding documents.
Deputy Minister of Construction Bui Xuan Dung highlighted that this is the first time Vietnam has undertaken such a large-scale, technically complex high-speed railway project. During the investment preparation phase, surveys and the feasibility study report, along with FEED, are crucial in determining the project's quality, feasibility, and investment efficiency.
The TV-02 consultancy consortium, led by France's SYSTRA, consists of eight members, including SYSTRA, three Korean firms (Sambo Engineering Co., Ltd, Yooshin Engineering Corporation, and Korea National Railway), and four Vietnamese firms (Transport Engineering Design Inc., South Transport Engineering Design Joint Stock Incorporated, Transport Engineering Investment and Construction Consultant Joint Stock Company, and Hoang Long Construction and Consultant Joint Stock Company).
The Thang Long Project Management Unit, as the project investor, will oversee the progress of Package TV-02, which is the top priority during the investment preparation phase. All parties must adhere to their contractual obligations and ensure that consultancy deliverables are scientifically sound, comply with the law, and demonstrate high feasibility in practical implementation.
Rewritten by urgent.news; may contain errors — check the original.
Source: en.sggp.org.vn