Urgent.News

What's breaking now, across hundreds of outlets.

World

Kisseman–Christian Village bridge to close for six months for reconstruction

The bridge linking Kisseman and Christian Village in Accra will be closed to traffic for six months from the second week of December to allow for its reconstruction and elevation under the Greater Accra Resilient and Integrated Development (GARID) Project. The works are intended to improve the flow of rainwater through the area and reduce […]

Kisseman–Christian Village bridge to close for six months for reconstruction

From the second week of December, the bridge connecting Kisseman and Christian Village in Accra will be shut off to traffic for six months. This closure is part of a reconstruction and elevation project under the Greater Accra Resilient and Integrated Development (GARID) initiative. The aim of these works is to enhance rainwater drainage and decrease the likelihood of flooding during heavy rainfalls.

Philip Dunyo, a Communication Specialist for the GARID Project, explained that alternative routes have been set up to lessen the inconvenience for motorists who frequently utilize the bustling road. Drivers traveling from Achimota will be guided along a path near a mosque until they arrive at the bridge, while those coming from Dome will utilize an alternate route at BJ Junction.

Dunyo emphasized that the road is highly busy and these alternative paths have been established accordingly. "The road is extremely busy, which is why we have established alternative routes for motorists to utilize," he stated. Kisseman and Christian Village residents have faced regular flooding in the past, often leading to fatalities, property damage, and forced displacement of households.

The current bridge is considered a contributing factor to these flooding events due to its narrow layout, which hinders water passage through the river during intense rainstorms. According to Dunyo, the reconstruction and elevation of the bridge will tackle this issue by enhancing water flow in the area. Motorists utilizing the bridge are urged to be aware of the scheduled closure and instead navigate the designated alternate paths during the construction phase.

Rewritten by urgent.news; may contain errors — check the original.

Sources: myjoyonline.com · adomonline.com

This story

This is one outlet's version. Read the fullest account.

Every outlet that reported this, and when →

Read the original at adomonline.com →

Report a problem with this story

More in World

More from Sunday 22 November →