Urgent.News

What's breaking now, across thousands of outlets.

Tech

Sensor Tower estimates GTA 6 generated $2.36bn in pre-order and launch-day sales

Sensor Tower estimates Grand Theft Auto 6 sold over 24.5 million copies through pre-orders and on launch day, generating approximately $2.36 billion in revenue. Read more

Sensor Tower estimates GTA 6 generated $2.36bn in pre-order and launch-day sales

We haven't written up this one. GamesIndustry has the full story — the link below goes straight to it.

Read the original at gamesindustry.biz →

More in Tech

The week everything fell apart

There was a dayslong Outlook outage. A nationwide ground stop for only the second time in 25 years. Banks seemed to suddenly stop working. Even iCloud couldn't stay up and running.

How to Check Whether an SVG Edit Introduced a Broken Reference

An SVG can contain one broken gradient reference before an edit and one after. It can also render exactly the same. To tell whether the edit introduced a new problem, compare the references…

  • Compare reference details to check for broken references after SVG edit.
  • Control file with original SVG serves as baseline for comparison.
  • Record unresolved references before and after edit to detect new issues.

What Does App Store and Play Store Review Actually Look for in 2026?

App Store and Play Store review in 2026 is no longer a visual inspection where a human taps through screens. Apple and Google now run automated binary decompilation, require privacy manifests, push…

  • Automated systems perform binary decompilation and enforce compliance checks before human review.
  • Both stores require clear account deletion paths and data deletion mechanisms within apps.

Seedance API in Python: Track the Cost of Each Usable Clip

A job can succeed and still deliver a clip you can't use. If the product changes color halfway through a shot, a second paid render may be the only practical fix.

  • Submit fixed-length test job with single input photo for cost tracking.
  • Poll job status asynchronously until terminal (succeeded, failed, cancelled, expired).
  • Record accepted outputs per asset with corresponding settled charges for cost calculation.

More from Friday 20 November →