Nigeria’s grid breaches limits despite 85% plant utilisation
Nigeria’s electricity grid operated outside prescribed frequency and voltage limits in October, despite power plants using 85% of available capacity. Read More: https://punchng.com/nigerias-grid-breaches-limits-despite-85-plant-utilisation/
In October, Nigeria's electricity grid operated outside prescribed frequency and voltage limits, despite power plants utilising 85% of their available generation capacity, raising concerns about the stability of the country's power system. The Nigerian Electricity Regulatory Commission (NERC) reported that the grid recorded frequency levels below the prescribed range (49.46 Hz) and above the range (50.66 Hz), while voltage levels exceeded limits (305.00 kV and 353.94 kV).
Even with high utilisation of power plants' capacity (average 85%), the deviations highlighted the challenges facing Nigeria's fragile power system.
Written by urgent.news from Punch's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.