GRIDCo assures improved power supply for Ashanti Region by December
The Ghana Grid Company Limited (GRIDCo) says the Ashanti Region is expected to experience a significant improvement in power supply by December 2026, after persistent complaints of intermittent outages and calls for a load-shedding timetable. Chief Executive Officer Ing. Frank Asirifi Otchere, revealed this while briefing the Ashanti Regional Minister on ongoing infrastructure upgrades aimed […]
The Electricity Company of Ghana (ECG) aims to finish critical power infrastructure projects in Bekwai, Barekese, and Offinso by December. These communities have faced frequent power outages, disrupting businesses and residents. In Bekwai, the erratic supply has led to calls for protests, and ECG's Deputy Managing Director, Ing.
David Asamoah, revealed plans for a double-circuit distribution line. The line, costing GH¢2.4 million, will pass through Sewua and Kuntenase, improving electricity reliability when completed. Offinso received a transformer upgrade from 10MVA to 20MVA, enhancing power supply capacity. The 10MVA unit from Offinso has been installed in Barekese to boost electricity provision.
Construction is underway to extend a new distribution line to Barekese's Ghana Water Limited facility, addressing their operational shutdown risks. Additionally, ECG is connecting transmission lines from Airport to Anwomaso to ensure a more stable power supply for the new airport. The Ashanti Region's power infrastructure is a priority for ECG's commitment to improving electricity reliability.
Written by urgent.news from MyJoyOnline Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.