ECRL Gombak station’s covered link bridge to LRT ready by March 2027, temporary walkway in place for December launch
KUALA LUMPUR, Oct 23 — Passengers using the East Coast Rail Link (ECRL) Gombak station will have a temporary walkw...
KUALA LUMPUR, Oct 23 — When the East Coast Rail Link (ECRL) Gombak station begins operations in December, passengers will be greeted with a temporary walkway leading to the Gombak LRT station, according to Malaysia Rail Link Sdn Bhd (MRL). The official statement from MRL explains that a permanent covered pedestrian bridge connecting the two stations is set to be completed by March 2027.
The temporary walkway will be situated within existing connecting areas and Prasarana facilities, ensuring passenger safety, comfort, and ease of movement. MRL is in discussions with Prasarana regarding a shuttle service between the two stations, particularly for passengers carrying luggage. The railway company reassures the public that pedestrian access and public transport integration have been considered during the ECRL project development, emphasizing that temporary access is being arranged to cater to passenger needs when services commence.
Written by urgent.news from Malay Mail's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.