Urgent.News

What's breaking now, across thousands of outlets.

World

Rail electrification upgrade across 596 track km to support Vande Bharat, 160 kmph trains on Delhi-Mumbai route

Rail electrification upgrade across 596 track km to support Vande Bharat, 160 kmph trains on Delhi-Mumbai route

The Ministry of Railways has upgraded electrification infrastructure across 596 kilometers of track in the Kota Division of West Central Railway to support future Vande Bharat services and high-speed train operations. This upgrade includes the commissioning of a modern 2×25 kV traction power supply system, which will be able to meet the higher electrical demands of faster trains and increased freight traffic on the Delhi-Mumbai route.

Saurabh Jain, Senior Divisional Commercial Manager of the Kota Division, stated that the upgraded system is designed to improve power supply capacity, voltage stability, and reliability. The 2×25 kV system will help the railway network accommodate higher speeds, more frequent train movements, and increased traffic density. Four traction substations have been commissioned in the division, with the latest being the one at Bharatpur, which is now operating at full load.

The electrification upgrade is part of the broader efforts to improve speed and capacity on the Delhi-Mumbai corridor, which is targeted for train operations at speeds up to 160 kmph under Indian Railways Mission Raftaar.

Written by urgent.news from The Indian Express's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Also reported by 1 other outlet

Read the original at indianexpress.com →

More in World

US Announces Mexico Border Drone Ban 16 Oct

A Mexico border drone ban announced on 16 October bars unauthorized drones within one nautical mile of the line, with cartel drones named as the target.

  • US bans unauthorized drones near Mexico border on 16 October
  • Prohibits flights within 400 feet of border within 1 nautical mile radius
  • Aims to enhance security and protect personnel from cartel threats

Mexico Arrests CJNG Tunnel Builder on 16 Oct

A CJNG tunnel builder called El Ingeniero was arrested near Guadalajara and faces US charges, Mexico says, while the cartel's chief has a US$25 million bounty.

  • CJNG cartel member Luis Manuel N, known as El Ingeniero, arrested Oct 16
  • Suspect designed tunnels for drug smuggling into US
  • Federal forces seize weapons, drugs, vehicle during Zapopan raid

More from Saturday 17 October →