Cauvery bridge on Chennai-Tiruchi-Madurai NH reopened for traffic after repair work
The bridge was closed on June 25 to facilitate repair work by the by the NHAI’s concessionaire maintaining the section at an estimated cost of ₹10 crore
We haven't written up this one. The Hindu has the full story — the link below goes straight to it.