Tano River Protection, Forest Recovery Drive GoldBod’s GH¢35m Reclamation Project
By Magdalene Andoh Protecting water resources, stabilising degraded land and restoring biodiversity are central priorities of a GH¢35 million reclamation project being undertaken by the Ghana Gold Board (GoldBod) at the Tano Nimri Forest Reserve. The initiative is targeting 50 hectares of severely degraded land in Compartment 161 of the reserve, where illegal mining activities […]
The Ghana Gold Board (GoldBod) is spearheading a GH¢35 million reclamation project at the Tano Nimri Forest Reserve, with a primary focus on safeguarding water resources, rectifying degraded land, and bolstering biodiversity. The initiative aims to restore approximately 50 hectares of severely damaged woodland in Compartment 161, where illegal mining between 2021 and 2024 resulted in the loss of around 192.4 hectares of forest.
The aftermath left behind deep mining pits, a disrupted ecosystem, and a challenging environment for ecological recovery. Samuel Danso, Sustainability Manager at GoldBod, highlighted the significant ecological impact caused by a large-scale illegal mining invasion in 2022, which compromised biodiversity and timber concessions managed by Samatex Timber Company.
GoldBod is collaborating with the Ghana Armed Forces Engineer Regiment to rehabilitate the affected landscape, preparing it for reforestation. Engineering efforts include backfilling hazardous mining pits, blending mud with dry soil to stabilize the terrain, and constructing controlled drainage channels to manage runoff and prevent silt from entering the Tano River.
These interventions aim to create safer land conditions and protect the environment during the reclamation process. The project has progressed to the landscape preparation stage, with grading and levelling works to reduce soil erosion and provide suitable conditions for vegetation to regenerate. Upon completion of the engineering phase, the reclaimed 50-hectare site will be transferred to the Forestry Commission for tree planting and the reintroduction of indigenous plant species, marking a crucial step in rebuilding the forest canopy and restoring ecological functions in the area.
While the reclamation works cover a portion of the affected area, the broader scale of the damage emphasizes the ongoing challenge of rehabilitating forest reserves impacted by illegal mining. GoldBod emphasizes the importance of integrating natural-resource management with practical measures to repair environmental damage, underscoring its commitment to environmental sustainability, resource protection, and ensuring that economic progress does not compromise Ghana’s ecological heritage.
Rewritten by urgent.news; may contain errors — check the original.
Source: gbcghanaonline.com