Urgent.News

What's breaking now, across hundreds of outlets.

Business

Pilot, Tesla open first Megacharger site, 12 more underway

Pilot Travel Centers and Tesla have opened their first Megacharger site for heavy-duty electric trucks, Pilot said Oct. 8. The site, at a Pilot travel center in Ellabell, Ga., has six charging stalls. Twelve more heavy-duty sites are under construction, and three are nearly finished: a Flying J in Tulare, Calif., scheduled to open Oct. […] The post Pilot, Tesla open first Megacharger site, 12…

Pilot, Tesla open first Megacharger site, 12 more underway

Pilot Travel Centers and Tesla have inaugurated their inaugural Megacharger site for heavy-duty electric trucks at a Pilot facility in Ellabell, Georgia, on October 8. The location boasts six charging slots. Twelve additional heavy-duty charging sites are currently under construction, with three nearing completion: a Flying J in Tulare, California, set to launch on October 9; a Flying J in Fort Stockton, Texas; and a Pilot in North Las Vegas, Nevada.

Each site accommodates four to eight stalls operating on Tesla's V4 cabinet technology. According to Tesla, each stall can replenish up to 1.2 megawatts, enabling a Tesla Semi to regain 60% of its charge within 30 minutes. Pilot, a Berkshire Hathaway subsidiary based in Knoxville, Tennessee, manages over 900 locations spanning 43 U.S. states and five Canadian provinces.

The Megacharger network is slated for strategic positions along major freight routes like I-5, I-10, and others in California, Georgia, Indiana, Nevada, and Texas. Shannon Sturgil, senior vice president of alternative fuels at Pilot, expressed pride in bringing heavy-duty charging directly to crucial trucking routes and integrating it with essential driver amenities.

The Ellabell opening fell behind Pilot's projected timeline; the companies unveiled the partnership in January, anticipating construction to commence in the first half of 2026 with the first sites opening in the summer. The October announcement omitted New Mexico from the initial states listed. The arrival of these chargers coincides with Tesla's transition of the Semi into high-volume production, commencing at its Sparks, Nevada factory on September 24.

Tesla anticipates deploying more than 30 charging stations and over 200 megawatt-capable posts by year-end, including the Pilot installations. The plant's design caters to the annual production of 50,000 trucks. Pilot emphasized that these heavy-duty sites complement its existing passenger EV charging network and its renewable diesel and biodiesel offerings.

Sturgil remarked, "With these initial locations, we're making fleet electrification a more accessible option for long-haul transportation."

Rewritten by urgent.news; may contain errors — check the original.

Source: freightwaves.com

Read the original at freightwaves.com →

Report a problem with this story

More in Business

UCB hosts RMG Business Conclave 2026

United Commercial Bank PLC (UCB) organized the UCB RMG Business Conclave 2026 at The Westin Dhaka on October 13, bringing together senior executives and industry representatives from the readymade…

Paris Motor Show: Executive Family Cars

The narrative around executive motoring in London and the Home Counties has decisively shifted, writes motoring journalist Tim Barnes-Clay. The modern-day company director’s primary vehicle now needs to transition seamlessly from weekday commutes in The City to weekend continental family road trips.

Paris Motor Show: Agreeable Assets for the High-Net-Worth Individual

As the automotive landscape shifts toward electrification, the global supercar market continues to be dragged, perhaps reluctantly, in the same direction, writes Tim Barnes-Clay. Once ruled by raw mechanical power, modern supercars are increasingly judged on innovation, alternative fuels, and, in some cases, scarcity through limited…

More from Wednesday, 14 October 2026 →