Hycroft hits bonanza gold grades at Nevada mine
Underground mining could bring richer material into production ahead of a much larger open-pit development, though Hycroft hasn’t established its economics.
Hycroft Mining has discovered exceptionally high-grade gold and silver at its Nevada mine, signaling potential for underground production. In Hole H26D-6175A, the company drilled 19.6 meters of rock grading 30.49 grams of gold per tonne and 1,726.72 grams of silver from 416.5 meters. CEO Diane Garrett stated that the high grades and longer intercepts may indicate an approaching source of the Vortex system.
The mine, located about 210 km northeast of Carson City, Nevada, could lead to richer material production before a larger open-pit development. Analyst Brian Quast estimates a $3.4-billion construction cost for the milling project, with a potential market capitalization of $1.5 billion. The company's New York-listed shares dropped 7.2% to $16.30 after the latest results.
The Vortex and Brimstone systems underpin Hycroft's underground studies, with a resource estimate of 18.1 million tonnes grading 154.71 grams silver and 0.512 gram gold per tonne. Engineering consultancy Respec is developing a conceptual underground mine plan, while metallurgical testing is ongoing. Metal recoveries and concentrate sale options are being reviewed.
Quast estimates $10 million in refurbishment costs for potential heap leaching restart and first production in the third quarter of next year. The larger milling project is modeled to begin construction in 2029 with first production projected in 2031, generating around 200,000 oz. gold and 6.7 million oz. silver annually over a 51-year life.
Rewritten by urgent.news; may contain errors — check the original.
Source: mining.com