Urgent.News

What's breaking now, across thousands of outlets.

Tech

Controversial North Wales data center the size of ‘57 football pitches’ sees opposition from tens of thousands

Previous plans for the site, including a prison and holiday park, were dropped or opposed.

Controversial North Wales data center the size of ‘57 football pitches’ sees opposition from tens of thousands

Plans for a massive 450 megawatt data center on a former factory site in North Wales have sparked opposition from tens of thousands. The proposed site, covering an area equivalent to 57 football pitches, would span the derelict Ferodo factory in Griffith’s Crossing, near Caernarfon. Over 24,000 people have signed an online petition opposing the development, and hundreds attended demonstrations demanding scrutiny of the project.

The developers, Canolfan Ddata Mena, argue that the AI data center would create 200 permanent jobs and hundreds of temporary construction roles. They plan to demolish all existing buildings and structures on the 40 hectare site, powered in part by local renewable sources with ecological enhancement measures. Collaboration with local education providers aims to maximize training opportunities during construction and operation.

However, opponents claim the development lacks clear and sustainable benefits for local residents. Plaid Cymru MP Liz Saville Roberts highlighted the scale of the proposed data center complex, stating that the change to the landscape demands the highest level of scrutiny and public engagement. She expressed concern over the history of extractive industries in Wales, warning that a similar outcome should not be repeated in the 21st century.

One major concern is the asbestos contamination from the former factory, as some areas still contain asbestos insulation. Developers assure that all works will adhere to Hazardous Waste Regulations, with contaminated materials disposed of at a licensed landfill facility in northern England. Despite previous considerations for other developments, such as a prison and a holiday park, the chosen data center proposal has sparked significant opposition.

Written by urgent.news from TechRadar's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at techradar.com →

More in Tech

Palantir and Sadiq Khan drop legal battle over Met contract

Dispute related to claims London mayor blocked US tech firm from £50m police deal because of concerns over its values Palantir and the London mayor, Sadiq Khan, have called off their legal fight over claims the Labour mayor was blocking the US tech company from signing a contract with the Metropolitan police because of its values and…

More from Wednesday 14 October →