Urgent.News

What's breaking now, across hundreds of outlets.

Tech

Cisco’s OCP message: The network is now AI’s critical path, and openness is the price of admission

For most of its history, Cisco Systems Inc. won by building vertically integrated network products and asking customers to buy all of it. The company did very well with that model. Security, meanwhile, was something Cisco sold as a separate product line rather than something that was inherent to its infrastructure. Patching a core switch […] The post Cisco’s OCP message: The network is now AI’s…

Cisco’s OCP message: The network is now AI’s critical path, and openness is the price of admission

Cisco Systems has shifted away from its traditional vertically integrated model and embraced openness, according to its new Chief Product Officer, Jeetu Patel. The company unveiled several innovations at the Open Compute Project Global Summit in San Jose, signaling a new direction for the network infrastructure market.

One key development is the introduction of a new pluggable optics form factor designed for 400-gigabit-per-lane signaling, capable of delivering up to 12.8 terabits per second. This module, known as the Ultra-Dense Small Form Factor Pluggable (USFP), aims to significantly increase bandwidth density and reduce operational costs by minimizing downtime and improving scalability.

Cisco has also launched its first Silicon One G300 systems, showcased the G302 top-of-rack chip, and introduced a new out-of-band management platform. Additionally, the Live Protect runtime security capability has been integrated into the SONiC (Software Open Network Interface Controller) operating system. These announcements underscore Cisco's commitment to building a network that is both open and secure, addressing the evolving needs of artificial intelligence (AI) workloads.

The company highlighted the growing trend of AI projects spanning campuses, metros, and regions, driven by the availability of power and real estate. Traditional data center interconnects struggle to handle the massive, synchronized data flows required by these large-scale deployments. Cisco's solutions focus on "scale-across" networking, which aligns the network directly with the workload performance, preventing GPU idle time and wasted resources.

Cisco's embrace of openness extends across multiple layers of the stack, including hardware, software, and networking protocols. The company is standardizing optics as a multisource agreement, promoting competition and driving down prices. Cisco's Software-Defined Networking (SDN) platform, SONiC, has been made a first-class offering, with support for various open-source and proprietary networking operating systems.

This flexibility allows customers to choose the components that best suit their needs, expanding Cisco's potential customer base beyond those who prefer a closed ecosystem.

A notable innovation is Cisco's Live Protect runtime security capability, which detects remote congestion and link failures in hardware time, significantly reducing the mean time to exploit a vulnerability from about nine months to roughly 10 hours. This advanced security feature is being standardized by the Internet Engineering Task Force, demonstrating Cisco's commitment to security alongside its drive for openness.

Overall, Cisco's strategic shift towards openness and AI-centric networking positions the company to capture a larger share of the rapidly growing AI infrastructure market. By offering customizable, scalable solutions that integrate seamlessly with leading AI hardware and software, Cisco aims to provide customers with the flexibility and performance needed to meet the demands of modern AI workloads.

Rewritten by urgent.news; may contain errors — check the original.

Source: siliconangle.com

Read the original at siliconangle.com →

Report a problem with this story

More in Tech

Here are all the new HomePod Mini 2 colors

Apple's HomePod Mini 2 is here, and we've gotten a close-up look at the second-gen smart speaker. The HomePod Mini 2 comes with an upgraded S10 chip capable of powering Siri AI, though Apple says support for new AI features will roll out as part of a future update. It also offers a sound glow […]

More from Tuesday 13 October →