Urgent.News

What's breaking now, across hundreds of outlets.

Business

US giant pays for delaying HAL’s fighter dreams

In the wake of supply chain complications, US company GE Aerospace has faced penalties for delaying deliveries of engines crucial for India's Light Combat Aircraft (LCA) project. Despite this, the company has consistently pledged its commitment to fulfilling the fighter jet requirements for Hindustan Aeronautics Limited (HAL).

In a recent statement, GE Aerospace disclosed that it had shipped four additional sets of engines last month, with production expected to rise in the upcoming year. The company remains dedicated to providing the engines necessary for the LCA Mk1A, which is a vital component of the Air Force's procurement strategy. HAL had placed an order for 99 F404 engines amounting to $700 million, with deliveries expected to commence in 2024.

However, due to supply chain issues, these deliveries were significantly delayed, contributing to the overall postponement of the LCA Mk1A's induction.

An additional $1 billion contract for 113 F404 engines was signed with GE last year, catering to the second batch of LCA Mk1A fighter jets. Concurrently, HAL is in ongoing discussions with GE for the potential transfer of technology for the more advanced F414 engines. The LCA Mk2, the next generation of the Tejas fighter jet, is already in prototype production and will be powered by the GE 414 engine, which will also be manufactured in India under a technology transfer agreement.

Rewritten by urgent.news; may contain errors — check the original.

Read the original at economictimes.indiatimes.com →

Report a problem with this story

More in Business

Tesla Semi lands 50-truck order from drayage carrier IMC

IMC Logistics is adding 50 Tesla Semis to its California fleet, putting Standard Range models in port drayage and Long Range models on lanes between Southern California and inland destinations. The intermodal drayage provider announced the order in a release on Sept. 22.

Yolanda Díaz steps on the accelerator to announce the increase in the minimum wage for 2027 before the elections

The expert committee is convened to establish a range with the recommendation for revaluation for 2027. In recent years, the Ministry of Labour has implemented increases already in the year and with…

  • Yolanda Díaz announces 2027 minimum wage raise ahead of elections
  • Ministry of Labour forms committee to set benchmark for increase
  • Recommended raise likely around 3.6% to maintain purchasing power

More from Wednesday 7 October →