Urgent.News

What's breaking now, across thousands of outlets.

Business

Major Renovations: German Railways Renovates Berlin-Hanover Route – 14-Month Closure

The important connection has been under construction for more than a year. What does this mean for travellers and commuters?

Translated from German Read in German

Major Renovations: German Railways Renovates Berlin-Hanover Route – 14-Month Closure

Deutsche Bahn is currently undertaking a major overhaul of the 230-kilometer Berlin to Hannover railway line, which will be fully closed for 14 months starting from early 2023. The closure is necessary due to the delayed electrification of the Lehrter branch line, which forces all long-distance trains between Berlin and Hannover to reroute through Braunschweig and Magdeburg.

The closure begins in the early morning and is expected to remain in effect until mid-December 2027. During this period, hundreds of kilometers of track, switches, and overhead lines will be replaced, and more than two dozen stations will be modernized. The most challenging aspect is the renewal of over 50 kilometers of concrete trackbed near Stendal, involving the removal and replacement of thousands of tons of concrete slabs.

The Deutsche Bahn aims to ensure a more reliable and punctual service after the completion of the work, but previous major overhauls have shown that this may not always be the case. For example, the Riedbahn between Frankfurt and Mannheim and the Hamburg-Berlin line were not fully completed within a half-year. The extensive closure of the Berlin-Hannover line is primarily due to the need to replace more than 50 kilometers of fixed concrete trackbed near Stendal.

Written by urgent.news from Handelsblatt's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

This story

This is one outlet's version. Read the fullest account.

Every outlet that reported this, and when →

Read the original at handelsblatt.com →

More in Business

More from Friday 2 October →