IDF: Drakon submarine has stronger weapons, longer underwater capabilities
This Drakon submarine is the sixth submarine to join the Israeli Navy's fleet in recent years and the third of the Dolphin class (specifically, the Dolphin II variant equipped with an AIP system).
The IDF has announced that the newly acquired INS Drakon submarine boasts superior weaponry and enhanced underwater endurance compared to previous Israeli vessels. This is the sixth submarine to join Israel's fleet in recent years, and the third Dolphin class (Dolphin II variant with an AIP system). The AIP technology allows the submarine to generate power and recharge batteries while submerged, enabling prolonged operation without surfacing.
Unlike earlier models that could remain submerged for a few days to a couple of weeks, the Dolphin II-class Drakon can maintain deep underwater operations for significantly longer durations. Powered by hydrogen and oxygen, the Drakon can extend its covert missions and maintain operational readiness over extended periods.
Measuring over 70 meters in length, the Drakon is approximately 30% larger than its predecessors. Despite its size, less than one-fifth of the vessel is visible above the water surface. While the exact reasons for the Drakon's expanded design remain undisclosed, experts speculate that it could incorporate new capabilities such as vertical launch systems (VLS), increasing its versatility for various missions.
The submarine's armament includes 10 torpedo tubes - six standard 533 mm tubes and four larger 650 mm tubes capable of launching heavier weapons, specialized equipment, and even underwater vehicles. Reports suggest that these submarines may be equipped with nuclear weapons, contributing to Israel's triad of nuclear deterrence alongside land-based and air-based weapons.
The Drakon's arrival marks the completion of the second generation of Israeli navy submarines built in Germany, symbolizing the enduring defense partnership between Israel and Germany. The vessel's journey from Germany to Israel spanned about 4,000 nautical miles (8,000 km) and took over three weeks, although delays may have occurred due to diplomatic maritime issues since the October 7 war.
Over 12 years of development and 20 years of Israeli involvement in the project, involving Israeli and German naval officers and engineers, ensured the submarine's readiness for deployment.
The Drakon's advanced technologies enhance the Israeli navy's operational capabilities, enabling it to undertake diverse missions across various maritime domains. Its crew, composed of young and highly skilled professionals, demonstrates exceptional professionalism, responsibility, and sharp operational acumen. As part of Israel's ongoing commitment to the next generation of submarines, the upcoming Dakar class is currently under construction, with delivery expected by 2031.
Written by urgent.news from Jerusalem Post's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.