Bandar Malaysia-Seri Kembangan expressway to cost RM1.75bil
Construction is expected to take four years.
The Bandar Malaysia-Seri Kembangan Expressway (BSE) project, estimated to cost RM1.75 billion, is set to link key routes such as the KL-Seremban Expressway, MEX Highway, Sungai Besi Expressway, New Pantai Expressway, Kesas Highway, and the larger Sprint Highway network. The 8.2km elevated expressway, scheduled to take four years to construct, will be developed under a privatisation model known as "build-operate-transfer."
LSH Capital, a wholly-owned subsidiary of LSH Infra Sdn Bhd, along with Pertama Makmur Sdn Bhd, will jointly undertake the project through a special purpose vehicle. The Cabinet has given a preliminary approval to the project, with the relevant technical and financial studies, as well as concession negotiations, expected to wrap up within a year.
The BSE aims to enhance connectivity, reduce traffic congestion, and provide an alternate route for motorists in the Greater Kuala Lumpur area.
Written by urgent.news from Free Malaysia Today's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.