Urgent.News

What's breaking now, across thousands of outlets.

World

Panama Canal faces five-year wait for water solution

The Rio Indio project is expected to take five to six years to complete, after which the waterway will no longer need transit restrictions, even during droughts.

Panama Canal faces five-year wait for water solution

The Panama Canal authority's new head Ilya Espino de Marotta has stated that once the Rio Indio infrastructure project is completed in five to six years, the canal will not face water shortages even during droughts. However, if there is insufficient rain in the next three months, the canal may need to impose more restrictions on ship transit.

The Rio Indio reservoir is being developed to provide water for the next 50 years for over half of Panama's population and to ensure the operation of the Panama Canal. The canal relies on fresh water to operate the locks that allow ships to cross between the Pacific and Atlantic oceans. The canal's operations depend on two man-made reservoirs, Gatun and Alajuela lakes, which release water each time a ship passes through to raise and lower the vessels.

A strengthening El Nino weather phenomenon has raised concerns about a potential water shortage at the Panama Canal, which handles around 3% to 5% of global maritime trade. The canal authority recently postponed a planned reduction in the maximum authorized draft for its Neopanamax locks, as the upcoming El Nino season is expected to further reduce water levels.

Written by urgent.news from Free Malaysia Today's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

This story

This is one outlet's version. Read the fullest account.

Read the original at freemalaysiatoday.com →

More in World

More from Monday 7 September →