West Bengal train services hit for 2nd day after track sinks, repair work on war footing
Heavy rain has caused train services in West Bengal to be severely disrupted for the second consecutive day, as soil subsidence beneath railway tracks near New Farakka station in Murshidabad district led to erosion and damage. Eastern Railway has canceled or diverted numerous trains, with some trains potentially resuming operations late Saturday evening following trial runs and safety certification.
Restoration efforts are being carried out at a rapid pace, with additional workers deployed to repair damaged overhead electric poles and railway tracks. Trains are expected to operate at reduced speeds for several days after services resume.
Written by urgent.news from The Indian Express's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.