Bhopal’s Bhoj Wetland Demarcation: Drone Survey May Begin Today, Panel Gets 15-Day Deadline
Bhopal (Madhya Pradesh): Preparations for the 7th demarcation of Bhopal's major water bodies and wetlands have reached the final stage following directions from the National Green Tribunal (NGT). A drone survey of the Bhoj Wetland, along with Kerwa and Kaliasot water bodies, may begin on Saturday, subject to favourable weather and the water level reaching the prescribed Full Tank Level (FTL). The…
The National Green Tribunal (NGT) has directed the formation of a seven-member committee for the 7th demarcation of Bhopal's major water bodies and wetlands, including the Bhoj Wetland, Kerwa, and Kaliasot. The committee, which includes environmentalist Dr Subhash C. Pandey and municipal corporation superintending engineer Santosh Gupta, has been given a 15-day deadline to complete the survey.
A drone survey of the Bhoj Wetland may commence on Saturday, pending favorable weather conditions and the water level reaching the prescribed Full Tank Level (FTL). The Madhya Pradesh Pollution Control Board (MPPCB) is coordinating the survey in compliance with the NGT's directives.
Brief written by urgent.news from Free Press Journal's own syndicated text. Machine-written — may contain errors; check the original before relying on it.