Inside the Nepal Tunnel Rescue Operation
An Australian engineer advising the effort described how two men were freed after nine days trapped in a tunnel at the Upper Trishuli 3A hydropower plant.
We haven't written up this one. The New York Times has the full story — the link below goes straight to it.
Also reported by 1 other outlet
- Inside the Nepal Tunnel Rescue Operation nytimes.com