2 trapped workers rescued from a hydropower tunnel 9 days after Nepal floods
Officials say rescuers in Nepal have pulled two workers alive from a tunnel Friday during an ongoing operation. The rescues come nine days after the Aug. 26 floods.
KATHMANDU, Nepal — Rescuers successfully extracted two workers from a hydropower tunnel on Friday, nine days after devastating floods struck the region due to a glacial collapse. The men, identified as a mechanical foreman and a mechanical supervisor, were rescued from the Trishuli 3A tunnel. The floods, which occurred on August 26, caused widespread destruction, washing away villages and sweeping away towns in Nepal.
Nepalese lawmaker Shri Ram Neupane shared the news of the second rescue on his Facebook page after army spokesperson Brig. Gen. Raja Ram Basnet confirmed the rescue of the first worker. Both rescued men were in stable condition and were airlifted to a hospital in Kathmandu. At least 557 workers remain missing from the Trishuli 3A hydropower project, with approximately 115 believed to be trapped in the main tunnel.
Written by urgent.news from The Korea Times's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- One trapped worker rescued alive from a tunnel in Nepal, official says mainichi.jp
- 2 trapped workers rescued from hydropower tunnel 9 days after Nepal floods koreatimes.co.kr
- Two trapped hydropower workers rescued from mud-clogged tunnel in Nepal france24.com
- 2 Rescued Alive From Hydropower Tunnel 9 Days After Nepal Floods ndtv.com
- Two hydropower workers rescued alive after nine days trapped in Nepal tunnel euronews.com
- Breaking: Two people rescued from Nepal hydropower tunnel, official says abc.net.au
- Workers pulled from tunnel in Nepal nine days after flash floods theage.com.au
- Workers pulled from tunnel in Nepal nine days after flash floods smh.com.au