Urgent.News

What's breaking now, across thousands of outlets.

World

Agbodza orders Wa-Bulenga road contractor back to site

The Minister for Roads and Highways, Governs Kwame Agbodza, has ordered Aschal Investment Limited to immediately return to site and complete the 37-kilometre Wa-Bulenga Road in the Upper West Region.

Agbodza orders Wa-Bulenga road contractor back to site

Governs Kwame Agbodza, the Minister for Roads and Highways, has directed Aschal Investment Limited to return to the site and finish the 37-kilometre Wa-Bulenga Road in the Upper West Region. The order came after observing the contractor's prolonged absence from the project, which was given in 2024. During a visit to the Wa-Bulenga-Yaala Road, Mr. Agbodza expressed his dissatisfaction with the speed of work and instructed the contractor to arrive at the site and fix the remaining problems without further delay.

The Minister emphasized that the government would not tolerate poor construction or unnecessary delays on road projects already awarded. He stated that the contractor must fix the parts of the road that are already showing signs of failure and make sure the project is finished on time. "Tell the contractor to come back to site immediately and fix all those things.

The thing is already failing. It is not rocket science, and you don’t have to be an engineer to know that what he has done will fail in no time, so call him back to site to address the issue immediately," the Minister said.

Written by urgent.news from MyJoyOnline Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

This story

This is one outlet's version. Read the fullest account.

Read the original at myjoyonline.com →

More in World

More from Thursday 3 September →