Urgent.News

What's breaking now, across thousands of outlets.

World

Accra–Kumasi Expressway: GAF clears 170km corridor, only 6km left

The Ghana Armed Forces Engineers have cleared 170 kilometres of the 176-kilometre corridor earmarked for the proposed Accra–Kumasi Expressway, leaving just six kilometres to complete the exercise. The development marks significant progress in preparations for the major road project, with the military engineering team expected to clear the remaining stretch as it advances towards Sawua. […]

Accra–Kumasi Expressway: GAF clears 170km corridor, only 6km left

The Ghana Armed Forces Engineers have completed 170 kilometres of the 176-kilometre corridor designated for the proposed Accra–Kumasi Expressway, leaving only six kilometres to finish the project. The military engineering team has made significant progress in the challenging terrain leading to Sawua, as reported by the Ghana Armed Forces on September 3, 2026.

A post on X praised their efforts, stating, "The finish line is in sight. Out of 176 kilometres of challenging terrain, just 6 KM REMAIN!" This update follows an earlier announcement in July that over half of the expressway corridor had been cleared, with 89.5 kilometres completed by June 25, 2026. The remaining work is expected to create the necessary right of way for major construction, reducing travel time and improving connectivity between Accra and Kumasi.

Written by urgent.news from Adom Online's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Also reported by 1 other outlet

Read the original at adomonline.com →

More in World

More from Thursday 3 September →