Work on Route Einstein from 14 September: two-way traffic maintained
Work will be carried out on Route Einstein from 14 September to 8 November 2026. To minimise disruption, both lanes of traffic will be kept open during the day for the entire duration of the work. Work that requires parts of Route Einstein to be closed is scheduled to be carried out at night, between […]
We haven't written up this one. CERN has the full story — the link below goes straight to it.