Several vehicles stranded at Doli Bridge due to muddy Bole highway
More than 100 vehicles have reportedly been stranded at the Doli Bridge along the Bole highway after muddy clay used in ongoing road construction made the stretch difficult to navigate.
Over a hundred vehicles reportedly found themselves stranded at the Doli Bridge on the Bole highway in the Savannah Region. The issue arose due to muddy, clay-based construction material used in recent roadwork, making the stretch slippery and unsafe for motorists. Vehicles were unable to safely cross the bridge because of the slippery conditions, which were directly caused by ongoing construction activities along the Bole highway.
The Bole District Police Command has been actively involved, with personnel deployed to manage traffic and assist the stranded motorists. ASP Mahadi Mensah, the District Police Commander, is at the forefront, urging drivers to drive with extreme caution as they approach the problematic section. Authorities have advised all motorists to reduce their speed and follow police instructions while efforts are ongoing to restore safe passage. Further updates are anticipated as the situation is being addressed by the relevant authorities.
Written by urgent.news from MyJoyOnline Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.