Prabowo kicks off solar power push with groundbreakings, open tenders
At the event on Tuesday, President Prabowo Subianto broke ground on solar power plants in Banyuwangi and Pasuruan in East Java, as well as at Gajah Mungkur Reservoir in Central Java, with a combined capacity of 396.4 MWp.
We haven't written up this one. The Jakarta Post has the full story — the link below goes straight to it.