PLUS announces 6-month traffic diversion on NKVE
The highway operator says the diversion is to facilitate the construction of a pedestrian bridge and maintenance work.
The New Klang Valley Expressway (NKVE) will experience a six-month traffic diversion on the Damansara-Shah Alam route between Km13.60 and Km14.35 starting today. This measure, announced by highway operator PLUS Malaysia Bhd, aims to enable construction of a pedestrian bridge across the highway and maintenance work by Pinnacle Homes AD Sdn Bhd, according to Bernama.
Motorists are required to adhere to all traffic signs and instructions from PLUS personnel to ensure safe and efficient traffic flow during the diversion. PLUS advises commuters to plan their journeys and stay updated with the latest traffic information via the PLUS app, official social media channels such as X @plustrafik, and variable message signs at selected locations. In case of emergencies, travelers can reach PLUSLine at 1-800-88-0000 for assistance.
Written by urgent.news from Free Malaysia Today's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
Also reported by 2 other outlets
- NKVE traffic diversion in both directions for six months nst.com.my
- PLUS announces 6-month traffic diversion on NKVE freemalaysiatoday.com