Bui Power Authority records US$66.2m profit as solar expansion boosts 2025 performance
The Bui Power Authority (BPA) recorded a net profit of US$66.2 million in the 2025 financial year, following improved energy generation and expansion of its renewable energy capacity. The Authority generated revenue of US$145.9 million during the year, with total energy output reaching 1,438GWh, exceeding its projected target of 1,350GWh by 6.5%. Chief Executive Officer of BPA, Ing. Kow Eduakwa…
The Bui Power Authority (BPA) reported a net profit of US$66.2 million for the 2025 financial year, boosted by enhanced energy generation and the expansion of its renewable energy capacity. Generating revenue of US$145.9 million, the Authority's total energy output reached 1,438GWh, surpassing its target of 1,350GWh by 6.5%. BPA's Chief Executive Officer, Ing.
Kow Eduakwa Sam, unveiled these figures at the 2025 Annual Stakeholders Meeting held in Accra. The Bui Hydroelectric Plant operated at an average availability rate of 95%, underscoring the reliability of the main generation asset. Despite leadership shifts at the Ministry of Energy, the BPA Board and Executive Management maintained operational stability, adhering to their strategic plans.
During 2025, BPA expanded its Solar Photovoltaic (PV) capacity from 55MWp to 105MWp, complementing its 404MW hydropower capacity. While hydropower comprised 1,339GWh, or 97% of the total energy produced, BPA's progress in feasibility studies for proposed hydropower projects on the Tano, Pra, and Ankobra rivers was significant. The Authority also continued investments in infrastructure projects, including the Bui Generating Station's Staff Accommodation Project, with Phase One at 97% completion and Phase Two at 51%.
Phase Two of the Yendi Solar PV Project reached 75% completion. However, BPA faced challenges, with cash flow constrained due to high outstanding receivables from major off-takers. This impacted the Authority's ability to finance its growth agenda and support critical operations. BPA remains committed to social investments, awarding 29 new tertiary scholarships and organizing the "TechQueens" Summer Camp for girls to learn foundational ICT, AI, and robotics skills.
Looking ahead, BPA aims to increase its operationalized solar capacity to approximately 205MWp by adding 100MWp of Solar PV capacity. The Authority also plans to develop 300MWp of dispatchable Solar PV Plants with Battery Energy Storage Systems (BESS) by the end of 2028, as part of Ghana's Green Transition agenda.
Written by urgent.news from Joy Business's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.