Bui Power Authority records US$66.2m profit as solar expansion boosts 2025 performance
The Bui Power Authority (BPA) recorded a net profit of US$66.2 million in the 2025 financial year, following improved energy generation and expansion of its renewable energy capacity. The Authority generated revenue of US$145.9 million during the year, with total energy output reaching 1,438GWh, exceeding its projected target of 1,350GWh by 6.5%. Chief Executive Officer of BPA, Ing. Kow Eduakwa…
The Bui Power Authority (BPA) reported a net profit of US$66.2 million for the 2025 financial year, driven by enhanced energy generation and the growth of its renewable energy capacity. The Authority generated revenues of US$145.9 million, surpassing its projected output of 1,350GWh by 6.5% with a total energy output of 1,438GWh.
Chief Executive Officer Ing. Kow Eduakwa Sam disclosed these figures during the BPA's 2025 Annual Stakeholders Meeting in Accra. Despite leadership changes within the Ministry of Energy, BPA maintained operational stability, implementing its strategic plans consistently.
The Authority expanded its installed Solar Photovoltaic (PV) capacity from 55MWp to 105MWp in 2025, complementing its 404MW hydropower capacity. Hydropower continues to be the primary source of generation at 97% of the total energy produced. Progress was also made in feasibility studies for proposed hydropower projects along the Tano, Pra, and Ankobra rivers.
Infrastructure projects to support future expansion advanced, with the Staff Accommodation Project at the Bui Generating Station at 97% completion and the Yendi Solar PV Project at 75%.
Despite the positive financial results, BPA's expansion plans face challenges, including cash flow constraints due to high outstanding receivables from their major off-taker. To address this, BPA continues to invest in social programs, including 29 new tertiary scholarships and a "TechQueens" Summer Camp for girls, where 50 youths learned foundational skills in ICT, AI, and robotics.
Looking to the future, BPA aims to boost its operationalised solar capacity to approximately 205MWp by adding 100MWp of Solar PV capacity. BPA also plans to develop 300MWp of dispatchable Solar PV Plants with Battery Energy Storage Systems (BESS) by the end of 2028, aligning with Ghana's Green Transition agenda. Ing. Sam emphasized BPA's commitment to innovation, operational efficiency, financial sustainability, and delivering long-term value to stakeholders as they strive towards these goals.
Written by urgent.news from MyJoyOnline Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.