Winter sports: Less waiting, more capacity: 13 new lifts in the Alps
The ski season is poised to begin, and many Alpine ski resorts have upgraded. Lifts have been newly built or moved within a valley. What winter sports enthusiasts can look forward to.
In the winter of 2021, hundreds of millions of Euros were invested in building and renovating facilities across the Alps. Thirteen new facilities stand out, improving accessibility and capacity for skiers.
1. In Carinthia, the Gipfelgondel in Gerlitzen Alpe opened in October, boasting the most powerful gondola in Carinthia. This 82-seater cable car can transport 4,000 people per hour and cost 22 million Euros to build.
2. The Walmendingerhornbahn in Kleinwalsertal, which operated for over 60 years, has been replaced by a new cable car. The new cabins can hold 80 people, double the capacity of the old ones, and are designed to be wheelchair accessible. The opening is scheduled for December 24th, with a price of around 26 million Euros.
3. The Jodlalmbahn in Kitzbüheler Alpen replaces a double chairlift, previously considered a "nail salon". The new route leads directly to the 1,603 meter Harschbichl. Family-friendly, as children could now operate the former chairlift alone.
4. The Schmittenhöhe in Zell am See now leads to the Sisi-Kapelle with a dedicated cable car. The Sisi-Kapelle was built in 1904 in memory of Empress Elisabeth, who climbed the peak herself. The new cable car has seats for up to eight people, heated seats, and windproof hoods. The old chairlift will be rebuilt in Romania.
5. In the Paznauntal, Tirol, a six-person chairlift was built on the remains of the old Hellkarbahn in Ischgl. The new chairlift, with heated seats but no windproof hoods, launched just in time for the season. The operator explained that the seatbacks with hoods caused unexpected vibrations in certain wind conditions.
6. In Salzburger Land, a single gondola replaced three facilities: the Grafenbergbahn in Wagrain. With 120 ten-seater cabins, it takes ten minutes to reach the peak of 1,700 meters. This marks a "new clock" - costing around 40 million Euros.
7. In Tirol, the Venetbahn in Zams connects the Krahberg (2,212 meters) with eleven-minute ascents. The new cabins hold 60 instead of 44 people, and the original valley station was made barrier-free. The 11-kilometer ski area in Tiroler Oberland cost around 15 million Euros.
8. The double-decker gondola in Switzerland's Samnaun village, first introduced in 1995, was replaced with sleek black cabins for the Silvretta Arena. The renovated cable car and lift control will serve the cross-border large ski area shared by Samnaun and Ischgl.
9. In the Vallée-de-Verbier, a new mountain gondola links Verbier-Ruinettes and Savoleyres-La Tzoumaz. This two-part gondola system features cable cars and chair lifts alternating to access the summit or provide shelter in a lawnmower danger zone.
10. The Dolomiti-Skigebiet in South Tyrol has upgraded its facilities. A new heated rear-facing chairlift will transport up to 3,000 people per hour, just below Monte Elmo (2,433 meters). The Kronplatz cable car has also been renovated and now offers a new passageway to the summit. Dolomiti Superski, including Kronplatz, invested around 100 million Euros in new facilities and slopes.
11. The Dolomites 3 Zinnen region is bringing more skiers to the top. After replacing its 1989 helix gondola, the new 97-seater cable car will transport 3,250 people per hour faster to Monte Elmo (2,433 meters) with a wider descent.
12. A fire in 2018 destroyed parts of the Seilbahn in the Grands Montets, near Mont Blanc. The rebuilt cable car, with 97 ten-seater cabins, will transport up to 3,250 people per hour to Helm (2,433 meters). A wider descent accompanies the new cable car.
Rewritten by urgent.news; may contain errors — check the original.
Source: handelsblatt.com