Mumbai: BMC Demolishes 7 Structures To Clear Bharadawadi Road-SV Road Link, Ease K-West Ward Traffic
Mumbai, November 26, 2026: In a major push to decongest K-West Ward, the BMC has demolished seven obstructing structures to clear a crucial 30-metre stretch connecting Bharadawadi Road to SV Road. The action will pave the way for the 12.20-metre-wide Bharadawadi Road to connect directly with SV Road, removing a longstanding bottleneck and improving traffic flow for local residents and commuters.…
Mumbai, November 26, 2026: The Brihanmumbai Municipal Corporation (BMC) has taken significant steps to alleviate traffic congestion in K-West Ward by demolishing seven structures that obstructed a key 30-metre stretch between Bharadawadi Road and SV Road. This action, part of Phase I of the 6-kilometre-long SV Road widening project, will connect Bharadawadi Road directly to SV Road, eliminating a long-standing bottleneck and improving traffic flow for residents and commuters.
The demolition effort has already resulted in the removal of 113 out of the 160 structures identified for removal in the first phase, with nearly one kilometre of the encroachment-affected area cleared. Additionally, the project has restored access to a Catholic cemetery that had been inaccessible for nearly three decades due to the encroachment.
Rewritten by urgent.news; may contain errors — check the original.
Source: freepressjournal.in