India's mega Himalayan tunnel nears completion
The Zojila Tunnel, an ambitious infrastructure project, is on track to be completed in the next six to eight months, according to Union Minister for Road Transport and Highways Nitin Gadkari. Speaking at the 7th World Landslide Forum, Gadkari reported that about 70% of the tunnel's construction work has been finished. Once finished, the tunnel will offer a dependable route through the strategically crucial Zojila Pass, which is frequently shut down due to heavy snowfall during the winter months.
Gadkari highlighted that projects in the Himalayan region must be carefully planned, taking into account local geology, water systems, and slope stability. He also emphasized the relevance of contemporary technology and ongoing surveillance to guarantee safe construction in such difficult terrain. The 13.153-km tunnel, being dug at an altitude of approximately 11,578 feet above sea level, is being built along the Srinagar-Leh National Highway. Once operational, it will cut the travel time from one and a half hours to just 15 minutes.
Rewritten by urgent.news; may contain errors — check the original.
Source: economictimes.indiatimes.com