Urgent.News

What's breaking now, across hundreds of outlets.

World

Navi Mumbai to Thane to be a shorter drive: Airoli-Katai Naka corridor nears opening

Navi Mumbai to Thane to be a shorter drive: Airoli-Katai Naka corridor nears opening

The Airoli-Katai Naka Corridor, connecting Navi Mumbai to Thane, is set to become a shorter drive for commuters. The first two phases of the 12.71-km long corridor are nearing completion, with the Metropolitan Commissioner Sanjay Mukherjee inspecting the stretch recently. Phase 1, a 2.57-km stretch connecting Airoli to Thane-Belapur Road, and Phase 2, extending the corridor to Mumbra covering 3.43 km with a 1.69-km tunnel, are in the final stages of completion.

Both phases are expected to be opened simultaneously, providing an alternative route to Airoli city, Thane-Belapur Road, Mahape, Shil Phata, and Kalyan Phata. The finishing works, including slope stabilisation and protective measures around the tunnel approaches, are expected to be completed by December. The final phase, connecting Katai Naka on the Kalyan-Shilphata Road, is projected to take another two years to finish, with an anticipated completion date of late 2028. The 6.71-km stretch of the final phase will be entirely elevated.

Rewritten by urgent.news; may contain errors — check the original.

Source: indianexpress.com

Read the original at indianexpress.com →

Report a problem with this story

More in World

More from Wednesday 25 November →