Urgent.News

What's breaking now, across hundreds of outlets.

Finance & Markets

A study commissioned by Alto finds it would add $24.5 billion annually to the GDP

A high-speed train line between Quebec City and Toronto, set to be built by Alto, would inject $24.5 billion into Canada's GDP each year, primarily due to productivity gains, according to a recent study by Aviseo Conseil. The report, authored by economist Jean-Pierre Lessard, claims the proposed train would reduce "economic distance" and bring businesses and their clients closer together, resulting in significant productivity gains throughout the economy.

These gains would stem from shorter travel times, increased access to jobs and talent pools, easier in-person meetings, and reduced travel costs. The 1,000-kilometer high-speed rail would link Quebec City, Trois-Rivières, Laval, Montreal, Ottawa, Peterborough, and Toronto, with a station in Kingston still under consideration. The train, capable of reaching speeds of up to 300 km/h, aims to connect Montreal and Toronto in just three hours.

Despite facing opposition from the Conservative party and local residents, Aviseo's analysis estimates that delaying the project could cost Quebec and Ontario over $50 billion by 2050, based on the growth of annual intercity trips on the proposed route. Without the high-speed rail, the number of annual intercity trips is projected to rise from 80 million to 115 million by 2059.

Lessard argues that the current infrastructure is already saturated, and additional highway lanes, overpasses, and exits would be required to accommodate the increased travel demand. He emphasizes that the proposed train line offers a faster alternative, contributing to Canada's overall economic growth.

Rewritten by urgent.news; may contain errors — check the original.

Read the original at winnipegfreepress.com →

Report a problem with this story

More in Finance & Markets

Is USA Rare Earth Stock a Buy Now?

USA Rare Earth has ambitious plans, but the risks right now are too hard to ignore.

  • USA Rare Earth faces significant risks in Round Top project and rising interest rates.
  • Company reported $141 million operating loss and $0.44 adjusted loss per share.
  • Despite rare-earth metals' value, USA Rare Earth appears unsuitable for investment now.

UBA records N503 billion pre-tax profit in 9M 2026, down 13% YoY

United Bank for Africa (UBA) Plc recorded a pre-tax profit of N502.98 billion for the nine months ended September 30, 2026, representing a 13.1% decline from N578.60 billion reported in the…

  • UBA's pre-tax profit dropped 13.1% to N502.98 billion in 9M 2026
  • Gross earnings increased to N2.54 trillion, but profit after tax fell
  • Credit impairment charges significantly impacted profitability

Sismo de 6.7 en Perú: Se registran dos réplicas y hay 15 personas heridas

Al menos 15 personas resultaron heridas y decenas de viviendas y otras edificaciones resultaron afectadas por el sismo de magnitud 6,7 que se sintió durante la noche de este viernes en los Andes del…

  • Magnitude 6.7 earthquake strikes Peru, causing 15 injuries
  • Two aftershocks of magnitudes 5 and 3.5 recorded in Junín
  • Damage to homes and buildings in Junín and Huánuco regions

More from Saturday 21 November →