Urgent.News

What's breaking now, across thousands of outlets.

World

Pune: Bhide Bridge Shut Till December 31 For Metro Foot Overbridge Work

Pune: Pune’s Baba Bhide Bridge over the Mutha river has been closed to vehicular traffic to facilitate the construction of a pedestrian foot overbridge (FoB) connecting Deccan Gymkhana Metro station with the Peth areas. The closure, which is scheduled to continue until December 31, 2026, is expected to put additional pressure on alternative river crossings and roads in central Pune. The new…

Pune: Bhide Bridge Shut Till December 31 For Metro Foot Overbridge Work

We haven't written up this one. Free Press Journal has the full story — the link below goes straight to it.

Read the original at freepressjournal.in →

More in World

More from Friday 20 November →