Poland expects to sign $50 billion nuclear plant deal with Westinghouse, Bechtel early next year
The three-reactor plant on the Baltic coast is expected to supply about 10% of Poland’s electricity, with the first reactor due online in 2036.
Poland anticipates signing a $50 billion nuclear power plant agreement with US firms Westinghouse Electric and Bechtel in the early stages of 2027, according to Marek Woszczyk, the president of the state-owned entity managing the project. The $50 billion endeavor is part of Poland's strategy to enhance its energy security.
Woszczyk revealed that the deal is being finalized, with the signing expected by the end of the first quarter of 2027, though a delay has not impacted the project's timeline. The plant, situated on the Baltic coast in Pomerania, will house three Westinghouse AP1000 reactors, generating a total capacity of 3,750 megawatts. The first reactor is projected to become operational in 2036, the second in 2037, and the third in 2038. Current projections estimate the plant's contribution to Poland's electricity supply at around 10%.
PEJ intends to procure nuclear fuel from multiple suppliers and store it on-site to avoid dependence on a single source. Historically, Poland has sourced much of its energy from Russia, but the country severed ties with Moscow following Russia's 2022 invasion of Ukraine. Since then, Poland has shifted towards relying on US liquefied natural gas and nuclear technology, while reducing its reliance on coal in favor of renewables and natural gas.
Polish Energy Minister Milosz Motyka emphasized at a recent energy cooperation conference that Poland had broken free from Russia's energy dependency. He stated: "Russia used energy sources like a weapon." Woszczyk explained that the AP1000 was selected due to its proven track record and Poland's desire to strengthen its relationship with the United States. Nuclear cooperation discussions between the two nations began during Donald Trump's presidency and have continued under the Biden administration.
PEJ is also in discussions with French, Canadian, and US providers about constructing a second nuclear plant in another location within Poland, Woszczyk added.
Written by urgent.news from Jerusalem Post's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.