Urgent.News

What's breaking now, across thousands of outlets.

World

Senate Panel Raises Concerns Over New Dam’s Impact on Agriculture

The federal government has agreed to review the design of the proposed Panjgur Dam in Balochistan after senators raised concerns … Read More The post Senate Panel Raises Concerns Over New Dam’s Impact on Agriculture appeared first on ProPakistani .

Senate Panel Raises Concerns Over New Dam’s Impact on Agriculture

Congressional lawmakers have voiced apprehensions regarding the proposed Panjgur Dam in Balochistan, expressing concerns over its potential impact on agricultural lands, date palm groves, and traditional irrigation systems. This matter was deliberated during a meeting of the Senate Subcommittee on Problems of Less Developed Areas, presided over by Senator Jan Muhammad Buledi at Parliament House.

Buledi queried why the consequences on current irrigation systems had not been adequately evaluated during the project’s initial planning stages. He emphasized that development initiatives ought to yield benefits for local communities and advocated for considering smaller dams as an alternative. MNA Pullain Baloch from the National Party also urged a comprehensive appraisal of the proposed canal system's repercussions on farmland, settlements, and local livelihoods.

Authorities from the Planning Division promised the panel that the dam’s design would undergo review in collaboration with the Irrigation Department. During the briefing, the project's director disclosed that Panjgur once boasted 118 traditional underground irrigation channels, called karezes, which irrigated around 6,000 acres of farmland.

However, solar-powered water extraction systems have adversely affected 72 of these channels, while water flows in 34 karezes have plummeted by over 50 percent in the last two years. The proposed dam is intended to irrigate approximately 25,000 acres of land. It would stand 33 meters tall, with a 30-kilometer canal on the left and a 9.8-kilometer canal on the right.

Officials briefed the committee that the original open-canal design had been revamped to a pipeline-based water supply system to safeguard thousands of date palms and agricultural land. The revised design has been approved, but a cost estimate from China remains pending.

Furthermore, the committee addressed the Gish Kaur Dam project and instructed the Water and Power Development Authority (WAPDA) to furnish a report on its prospective impact on agricultural production and water deliveries to Mirani Dam.

Written by urgent.news from ProPakistani's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at propakistani.pk →

More in World

Four theories swirl in Pyongyang over Kim’s top aide in Moscow

North Korean authorities have clamped down on talk of Jo Yong Won’s Russia visit after the November 2026 trip set off speculation in Pyongyang.

  • Jo Yong Won’s Moscow visit sparks four theories in Pyongyang.
  • First theory: Kim Jong Un may have sent a personal letter to Russia.
  • Heightened security measures imposed in Pyongyang.

More from Wednesday 18 November →