Urgent.News

What's breaking now, across thousands of outlets.

Finance & Markets

Elon Musk Says Earth’s Data Centers Are “Peanuts” Next to SpaceX’s Orbital Plans. Here’s the Math to Run Before Believing Him

The economics of orbital computing could eventually favor SpaceX.

Elon Musk has expressed that data centers in space could potentially surpass those on Earth in the future. According to a post he made on October 30th, he predicted that orbital computing capacity could surpass new terrestrial capacity by the end of 2028. While this is a bold statement, SpaceX has provided figures that allow for a more grounded assessment of the ambition.

SpaceX's IPO filing describes their long-term goal of deploying up to 100 gigawatts of computing power into space annually. This would essentially mean adding the equivalent of 100 large, 1-gigawatt data centers each year, based on power capacity. Their proposed solution involves solar-powered satellites, each equipped with AI processors, communications equipment, and cooling systems.

Their first generation AI1 satellite is capable of delivering around 120 kilowatts of sustained computing power. This leads us to some interesting calculations. To hit SpaceX's annual target of 100 gigawatts, they would need to launch approximately 833,000 AI1 satellites every year, assuming they continue to use their first-generation design.

SpaceX estimates that they would need to transport around 1 million metric tons into space annually to meet this target. At Starship's current capacity of 100 metric tons per launch, this would translate to roughly 10,000 launches per year, or about 27 launches a day. This level of activity, before accounting for any interruptions or failures, would be unprecedented.

Despite SpaceX's advancements with reusable rockets, operating at such a frequency would be a whole different level of operation. It's worth mentioning that SpaceX's IPO prospectus suggested that future versions of Starship could carry up to 200 metric tons, which would halve the number of required launches. However, the potential benefits of space-based computing are notable.

Solar panels in certain orbits could generate electricity more consistently than terrestrial installations, potentially providing a more reliable power source. Orbital data centers could also bypass the grid connection delays and land requirements associated with terrestrial facilities. Yet, the question remains whether these advantages would result in lower overall operating costs.

This would depend significantly on factors like satellite manufacturing, launch expenses, maintenance, and cooling. Cooling in space poses a unique challenge since it's extremely cold, and satellites can't rely on air to dissipate heat. Instead, they must use specialized radiators to release excess heat into space, adding weight and complexity, especially as computing power increases.

Still, the potential for heat rejection in space without conventional cooling infrastructure could become a significant advantage if engineers can develop lightweight and efficient radiator systems. However, there are other factors that complicate the economics, such as launch expenses, radiation protection, satellite replacement, and communications infrastructure.

Until SpaceX proves the reliability of operating costs, it's impossible to conclude that orbital computing will be cheaper than terrestrial deployment. Skepticism is warranted about Musk's timeline for orbital computing to outpace terrestrial deployment. However, dismissing the underlying technology would be premature. SpaceX has already established a successful satellite communications business, developed reusable launch systems, and introduced a preliminary design for orbital computing.

Even achieving just 10% of their ambitious 100-gigawatt target would necessitate deploying an additional 10 gigawatts of computing capacity each year. This would represent a substantial new infrastructure market. While Musk's prediction of 2029 may seem overly optimistic, the potential to extend AI computing beyond Earth's electrical grids is certainly worth serious consideration. The opportunity, even if it takes longer than 2029, is indeed enormous.

Written by urgent.news from Motley Fool's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at fool.com →

More in Finance & Markets

Phathom: 3 Key Takeaways for Long-Term Investors

Back-to-back quarters of operating profit show the company is converting revenue growth into cash, a milestone that matters for debt covenants and financial sustainability.

  • Phathom reported $84.7 million in net revenues for Q3 2026, a 71% year-over-year growth.
  • The company is expanding VOQUEZNA coverage through physician education and $0 copay via BlinkRx.
  • Phathom achieved operating profitability and positive cash flow for two consecutive quarters.

More from Wednesday 18 November →