Edison spinge sul mini idrico, nel Canavese Montalto2 fa scuola
Il Gruppo investirà tra i 100 e i 150 milioni nei prossimi 5 anni - L’impianto piemontese sfrutta un vecchio insediamento e un piccolo salto d’acqua
Edison, a leading energy company, is expanding its presence in the mini hydro sector. The group has a decade-long history of projects, with around 300 million euros invested so far. In the next five years, Edison plans to accelerate its growth in the small-scale hydroelectric power sector, with investments ranging from 100 to 150 million euros. This growth will be achieved through new constructions and acquisitions, focusing on new developments along the main irrigation canals in northern Italy.
During a visit to the Edison plant in Montalto Dora, located in the Canavese province of Turin, Edison's CEO, Nicola Monti, highlighted the strategic importance of hydroelectric power as the "world's first renewable source." Monti also emphasized the company's long-standing tradition of innovation, stressing that Edison continues to focus on innovation while valorizing existing infrastructure and creating increasingly integrated installations.
Edison aims to contribute to a "distributed energy transition" that makes regions the protagonists and combines renewable energy production, efficient resource use, and respect for ecosystems. In Italy, out of 4,953 hydroelectric plants, 1,106 – generating 3,909 MW of power – are located in Piedmont, accounting for more than 22% of the national total. This places Piedmont as the leading region in the peninsula in terms of the number of plants, followed by Trentino-Alto Adige and Lombardy.
The Montalto 2 hydroelectric plant, built in 1934, is an example of an existing infrastructure being repurposed to recover energy potential without increasing water withdrawals and with attention to the environmental context. Legambiente, an environmental organization, praises this as a demonstration of sustainable management of the infrastructure and the surrounding territory.
The monitoring of hydrological and ecological conditions is part of a broader experiment on ecological defluxion involving the region, the metropolitan area of Turin, and Arpa, covering the Dora Baltea river basin up to its confluence with the Po River.
With a capacity of around 7.7 GWh per year, Montalto 2 produces renewable energy that meets the electricity demand of approximately 2,800 households, avoiding the emission of about 5,000 tons of CO2. Stefano Ciafani, president of Legambiente, noted that hydroelectric power represents an important asset in the new clean energy system, balancing clean energy sources while minimizing territorial impact.
Montalto 2 serves as a clear example of how small-scale hydroelectric plants can be integrated into artificial canals, both hydroelectric and irrigation systems, and utilize small water jumps for clean energy production. Edison operates in the energy production sector through a park consisting of over 250 plants, including hydroelectric power plants, wind farms, solar power plants, and thermal power plants.
Hydroelectric plants account for 129 of these installations, playing a significant role in the group's renewable energy production due to the ability to utilize existing water resources with established expertise.
Written by urgent.news from Il Sole 24 Ore's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.