Urgent.News

What's breaking now, across thousands of outlets.

Tech

Andhra’s first semiconductor plant to come up near Visakhapatnam with ₹2,387 crore investment

The chip assembly and testing unit at Tarluvada is the State’s first project under the India Semiconductor Mission and will create 1,000 jobs

Andhra’s first semiconductor plant to come up near Visakhapatnam with ₹2,387 crore investment

Andhra Pradesh is poised to become the first Indian state to host a semiconductor manufacturing facility, with Advanced System In Package Technologies Private Limited set to establish an Outsourced Semiconductor Assembly and Test (OSAT) plant in Tarluvada village, near Visakhapatnam. The project, approved by the Ministry of Electronics and Information Technology under the India Semiconductor Mission, will require an investment of ₹2,387.81 crore across two phases.

The facility is expected to create direct employment for 1,000 people, beginning with 200 jobs in Phase I and expanding to 800 jobs in Phase II. The groundbreaking ceremony for the OSAT facility is scheduled for June 8, and the plant will have the capacity to produce 96 million chips annually, contributing significantly to India's semiconductor supply chain and electronics ecosystem on the east coast.

Written by urgent.news from The Hindu's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at thehindu.com →

More in Tech

Data centre projects to generate 3,523 high-skilled jobs

MALAYSIA'S data centre projects are expected to generate 4,053 jobs, including 3,523 high-skilled positions, from 27 projects with an estimated investment value of RM225.97 billion.

  • 27 data centre projects with RM225.97 billion investment value
  • 3,523 high-skilled jobs in engineering, networking, cybersecurity
  • Entry-level employees earn RM3,000 to RM7,000 monthly

More from Wednesday 18 November →