Grid operators file closely watched large load interconnection reforms at FERC
The PJM Interconnection proposed revamping its interconnection process by studying large load and generation interconnection requests in a single, one-year review. Others focused on load flexibility, bring-your-own-capacity rules and cost transparency.
We haven't written up this one. Utility Dive has the full story — the link below goes straight to it.