CEC report may complicate Keralam’s plan to resume river sand mining
Keralam’s bid to end decade-long ban on river sand mining is on a collision course with a report by the SC-appointed Central Empowered Committee, which recommended a three-year roadmap to phase out unsustainable sand extraction from active river channels across the country
A three-year roadmap proposed by the Central Empowered Committee (CEC) could complicate Kerala's plan to resume river sand mining, which aims to extract 1.7 crore tonnes of sand from 14 rivers to end a decade-long ban. The CEC suggested the recovery of sand and other materials from floodplains and river channels should only be permitted where it is scientifically justified for flood management or river restoration, subject to necessary environmental safeguards.
Kerala's government, however, maintains that it is already following Supreme Court guidelines on river sand mining and will not be affected by the CEC's recommendations. The state government banned river sand mining in 2016, due to severe damage to river ecosystems, altered water flow, and destabilized riverbanks. It decided to resume mining, citing flood mitigation and growing demand for construction materials, identifying 189 potential mining sites along 14 rivers across seven districts.
The CEC recommends a national program for scientifically desilting dams and reservoirs, promoting M-Sand with environmental controls, and recycling construction and demolition waste to reduce dependence on active river channels. It also urges stricter regulation of mining in permissible areas, regular replenishment studies, sustainable extraction limits, and enhanced monitoring.
Environmental groups and experts urge the government to conduct an environmental impact assessment (EIA) before resuming river sand mining to avoid potential damage to river ecosystems and groundwater levels.
Written by urgent.news from The Hindu's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.