Perenti inks $67 million contract with AngloGold Ashanti at Geita gold mine
The deal has a 60-month term until October 31 2031.
Perenti Limited, an ASX-listed company, has secured a significant five-year contract worth approximately A$1 billion ($67 million) to continue operating at the Geita gold mine in Tanzania for AngloGold Ashanti plc. This contract is with Geita Gold Mining Limited, a subsidiary of AngloGold Ashanti, and is being executed through Perenti's joint venture, AUMS Geofields Tanzania.
The joint venture, AUMS, has been operating at the Geita gold mine since 2016 when the operation transitioned to underground mining. Perenti's CEO, Vanessa Torres, expressed delight at continuing the partnership with AngloGold Ashanti, emphasizing the strength of their relationship and shared commitment to safe, reliable, and productive underground mining. Torres looks forward to building on the trust and collaboration established at Geita and across their broader portfolio of operations with AngloGold.
Written by urgent.news from Mining.com's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.